Home  |   Contact  |   Email This Page  |   Print This Page
logo
 
 
 
Construction Updates

Blackland Corridor Study/Northeast Gateway Project
(Sept. 2014 Update)


Public Meeting:
Monday, Sept. 22, 2014, 6:30 pm

Utley Middle School Campus Performing Arts Center
1201 Townsend Drive
Rockwall, Texas 75087
Map to Meeting Location | Meeting Notice [PDF]

Click here to view a live stream of the public meeting.


Links:
NCTCOG Blacklands Corridor Study Website
NCTCOG Blacklands Corridor Study Newsletter
Texas Turnpike Corp. Project Website

The North Central Texas Council of Governments is in the process of completing a regional transportation study that encompasses Wylie, Sachse, Rowlett, Rockwall and Garland on the west and south end up to the Greenville and Hwy 380 area on the east and north end. The Blackland Corridor Study is looking at future population growth, future employment centers, travel patterns, existing roads, and all possible transportation solutions including transit, freight, improvements to I-30 and bicycle paths. One of the conclusions of the study is that a wholly new road is needed to relieve the current and future congestion issues on Hwy 78 and Interstate 30. Multiple public meetings have been held over the last few months, and very detailed and comprehensive information about the Blackland Corridor Study can be found on the NCTCOG website.


The Texas Turnpike Corporation (TTC) is a private sector company that is proposing a roughly 28 mile toll road, the Northeast Gateway Project, to meet the need of that new road. The TTC is utilizing a State statute that has since been repealed that gave the authority to a private entity to construct a toll road including the power of eminent domain. At this time, the TTC is going through a required environmental assessment process that is being monitored by the Texas Department of Transportation. A part of that process is to evaluate route alternatives, some of which would impact Wylie.

With regard to the Blackland Corridor Study, the staff of the NCTCOG make recommendations to the Regional Transportation Council (RTC), which is the independent transportation policy body of the Metropolitan Planning Organization for the Dallas-Fort Worth region. The RTC's 44 members include local elected or appointed officials from the 16-county metropolitan area and representatives from each of the area's transportation providers. The RTC oversees the metropolitan transportation planning process, including funding recommendations.

Also included in the Blackland Corridor Study are suggested arterial roads that might intersect with the proposed toll road. Specific to the Wylie area, Kreymer Lane is shown as a possible connection. The City’s Thoroughfare Plan has included Kremer Lane as a future major road for many years.  Kreymer Lane would be a logical north-south road for Wylie at some point in the future, with or without a proposed toll road.

The City of Wylie has been monitoring this project, attending the meetings, and remains in contact with the NCTCOG, TxDOT, TTC and our neighboring cities. Information regarding the preliminary routes (shown on the attached map) was just made available September 4th and will require a great deal of study and evaluation. There are multiple questions that still need to be answered before we believe we can come to an informed decision as to what stance the City may take in the future regarding the proposed Northeast Gateway Project.

Road Construction
To keep up with the demands of growth (184% increase in population since 2000), maintain a high quality of life, provide better access to schools and to promote economic development, since 2007 Wylie has invested and plans to continue to invest in more than 13 miles of new and reconstructed roadways. This is in addition to the Parker Road and Highway 78 projects that enhance access to Wylie. At the current cost of approximately $1.35 million dollars per lane mile, that’s more than $50 million in projects. Funding sources include the '03 & '07 County Bonds, '99 & '05 City Bonds, TxDOT and the Woodbridge Crossing (Target) developers agreement.

Click here for the City Engineer's Road Construction Update

For more information on Street and Capital Improvement Projects, please email the Public Information Officer or call 972-516-6016. 

 
 
City Of Wylie  |   300 Country Club Road  |   Wylie, Texas  75098  |   972.516.6000
Revize